QHSE

Socially Responsible

EXPERIENCE

Over 2 Decades

INTERNATIONAL

Presence in 7 Countries

  • 8601 Fawn Trail, Bldg. 3, Conroe, Texas (77385)
  • +1 (530) AUSTRAL / 287-8725

QHSE

Socially Responsible

EXPERIENCE

Over 2 Decades

INTERNATIONAL

Presence in 7 Countries

Integrated Project

INTEGRATED PROJECT OUTLINE

Apply a fact-driven approach to designing and optimizing the development of Oil & Gas Resources

Hands-on involvement in design and execution
Use existing data to its best capacity
High Engineering Standards
Plan and execute a data acquisition system in pace with development objectives
Vast experience in Well Construction, Well Planning, Directional drilling
Maintain a lean, focused, and multitask team between vendors, consultants, and service providers
Break down location barriers, establish an efficient supply chain bringing the best cost-efficiency
Manage a multilayer development timeline, and best practices while bringing the best time acceleration
Optimize well design for best production performance
Ensure repeatability and continuous improvement

WHAT IT IS ALL ABOUT

Upstream Development Accelerator

What we do

  • Boost available resources
  • Upstream engineering, procurement, and execution
  • Well planning
  • Cost efficiency – Lower Overhead
  • Transparency
  • Fast track to revenue

How we do it

  • Team building
  • Real-time decisions
  • Understanding and execution
  • Accountability
  • Analyze and improve
  • Worldwide supply chain and network
  • Worldwide experience in many fields

What we do not do

  • Over-analyze
  • Hidden costs
  • Unnecessary risks
  • Delegate decisions
  • Oversell, upsell

HORIZONTAL PATH CHARACTERIZATION

  • Enhance geologic modeling by drill data, accelerate improvement
  • Each stage is driven by changes in geological and stress setting
  • Geomechanics driven by targeted vertical hole wireline data
Top